WATER CENTER SALONE

YEAR: 2018

CUSTOMER: ACEA ATO 2

PLANT: ROME 

Design, construction and installation of a MT, QGBT cabin and panel for Inverter start-ups managed by PLC.

Plant Design: calculation report, electrical report, lighting engineering calculation for internal and external rooms, cabin plans for switchboards and cable ducts.

MV cabin installation with two 1250 kVA transformers.

QGBT realization.

Transformers.

Realization of a pump panel with inverter starts: 5 of 250 kW, 3 of 185 kW and 4 of 75 kW.

Creation of a PLC panel for automation and remote control of the system.

Realization of internal and external light and motive power systems.

PROJECT DOCUMENTATION

LAND PLANT

LIGHT SYSTEM AND MF

CAB LAYOUT

GEO SETTING

CAB DIAGRAM

GENERAL LAYOUT 