WATER CENTER SALONE
YEAR: 2018
CUSTOMER: ACEA ATO 2
PLANT: ROME
Design, construction and installation of a MT, QGBT cabin and panel for Inverter start-ups managed by PLC.
Plant Design: calculation report, electrical report, lighting engineering calculation for internal and external rooms, cabin plans for switchboards and cable ducts.
MV cabin installation with two 1250 kVA transformers.
QGBT realization.
Transformers.
Realization of a pump panel with inverter starts: 5 of 250 kW, 3 of 185 kW and 4 of 75 kW.
Creation of a PLC panel for automation and remote control of the system.
Realization of internal and external light and motive power systems.