Acquoria water center

TEATEK WATER

YEAR: 2020

PROJECT: UNDER CONSTRUCTION

CUSTOMER: ACEA

LOCATION: TIVOLI (RM)

QGBT design and panel for Inverter starts managed by PLC.

Plant Design: calculation report, electrical report, lighting engineering calculation for internal and external rooms, cabin plans for switchboards and cable ducts.
Realization QGBT arrival Transformers
Realization Panel Pumps with Inverter starts (2 from 315KW, 1 from 250 KW and 1 from 37KW
Realization of PLC panel for automation and remote control of the plant
Realization of distribution panel
Realization of pumps sectioning panels