Design, construction and installation of a
QGBT with 4000A switches
Softstarter switchboard
User distribution panel managed by REDUNDANT PLC

PLANT DESIGN
– calculation report
– electrical relationship
– lighting calculation for internal and external rooms
– MV substation and control room plans
– cable ducts.
REALIZATION
– QGBT with 4000A switches with 8 630KW Soft Starter Starters for Augers
– Pump panel with 5 160KW Soft Starter Starters
– Group network exchange framework
– Redundant Siemens 1500 PLC panel for plant automation and remote control
– Internal and external lighting and power plant distribution panel
– Replacement of the 4 1250 KVA transformers

PRELIMINARY WORK

Teatek srl

Via Maddaloni snc
c/o Consorzio 'AREA'
Acerra - 80011
NAPOLI - ITALY

info@teatek.it

+39 08118919610

P.IVA 06362981216

Leave a message

PRIVACY

6 + 5 =