urbe water lifting plant - roma nord purifier

TEATEK WATER

YEAR: 2020

PROJECT: IN PROGRESS

CUSTOMER: ACEA ATO 2

LOCATION:  ROME

Design, construction and installation of a
QGBT with 4000A switches
Softstarter switchboard
User distribution panel managed by REDUNDANT PLC

PLANT DESIGN
– calculation report
– electrical relationship
– lighting calculation for internal and external rooms
– MV substation and control room plans
– cable ducts.
REALIZATION
– QGBT with 4000A switches with 8 630KW Soft Starter Starters for Augers
– Pump panel with 5 160KW Soft Starter Starters
– Group network exchange framework
– Redundant Siemens 1500 PLC panel for plant automation and remote control
– Internal and external lighting and power plant distribution panel
– Replacement of the 4 1250 KVA transformers

ELECTRICAL PANELS

PRELIMINARY WORKS

Teatek S.P.A.

REGISTERED OFFICE
NAPOLI Via S. Lucia 36 - 80132

OPERATIONALS OFFICES
NAPOLI: Via Maddaloni snc c/o Consorzio 'AREA' - 80011 ACERRA
ROMA: Contrada Piombinara snc - 00034 COLLEFERRO
MILANO*: Via Polveriera 25 - 20026 NOVATE MILANESE

           *LOCATION NOT SUBJECT TO ISO VERIFICATION

info@teatek.it
teatek@adpec.it

+39 08118919610

P.IVA 06362981216

Leave a message

PRIVACY

9 + 5 =

TeaTek Logo Soatech
TeaTek Logo Perry Johnson
TeaTek Logo PJ
Developed by