Setteville Water Tank

YEAR: 2020

PROJECT: CLOSED

CUSTOMER: ACEA

PLANT: SETTEVILLE – GUIDONIA (ROMA)

Design, construction and installation of the electrical panel for the management, by inverter, of the two relaunches.

Electrical scheme design.
Electrical panel construction with two inverter starts for 37kW pumps.
Construction of electrical system and driving force of the site.
Lighting system inside and outside the switchboard room.

Teatek S.P.A.

REGISTERED OFFICE
NAPOLI Via S. Lucia 36 - 80132

OPERATIONALS OFFICES
NAPOLI: Via Maddaloni snc c/o Consorzio 'AREA' - 80011 ACERRA
ROMA: Contrada Piombinara snc - 00034 COLLEFERRO
MILANO*: Via Polveriera 25 - 20026 NOVATE MILANESE

           *LOCATION NOT SUBJECT TO ISO VERIFICATION

info@teatek.it
teatek@adpec.it

+39 08118919610

P.IVA 06362981216

Leave a message

PRIVACY

1 + 5 =

TeaTek Logo Soatech
TeaTek Logo Perry Johnson
TeaTek Logo PJ
Developed by