Setteville Water Tank

YEAR: 2020

PROJECT: CLOSED

CUSTOMER: ACEA

PLANT: SETTEVILLE – GUIDONIA (ROMA)

Design, construction and installation of the electrical panel for the management, by inverter, of the two relaunches.

Electrical scheme design.
Electrical panel construction with two inverter starts for 37kW pumps.
Construction of electrical system and driving force of the site.
Lighting system inside and outside the switchboard room.