Setteville Water Tank
YEAR: 2020
PROJECT: CLOSED
CUSTOMER: ACEA
PLANT: SETTEVILLE – GUIDONIA (ROMA)
Design, construction and installation of the electrical panel for the management, by inverter, of the two relaunches.
Electrical scheme design.
Electrical panel construction with two inverter starts for 37kW pumps.
Construction of electrical system and driving force of the site.
Lighting system inside and outside the switchboard room.
Teatek S.P.A.
Via Maddaloni snc
c/o Consorzio 'AREA'
Acerra - 80011
NAPOLI - ITALY
info@teatek.it
+39 08118919610
P.IVA 06362981216