MASCHERONE PURIFIER

TEATEK WATER

YEAR: 2021

PROJECT: UNDER CONSTRUCTION

CLIENT: ACEA ATO 2

LOCATION:  FIANO ROMANO (ROMA)

DESIGN AND CONSTRUCTION OF THE ELECTRICAL PANELS OF THE MASCHERONE PURIFIER, MANAGED THROUGH PLC.

PLANT DESIGN: calculation report, electrical report, lighting calculation for internal and external rooms, floor plans for cabin and switchboard rooms, cable ducts.
REALIZATION PCC PANEL
REALIZATION ELECTRIC PANEL 100 for distribution
REALIZATION PANEL MCC 101 with two 18.5KW inverter starts and 11 direct starts
REALIZATION PANEL MCC 102 with 9 direct starts
REALIZATION ELECTRIC PANEL MBR with 3, 55 KW, inverter starts. 3, 15 Kw, inverter starts and 8 direct starts
REALIZATION ELECTRIC PANEL LIFTING with 4, 15 Kw, inverter Starts
REALIZATION PLC ELECTRIC PANEL for the automation of the purifier

PCC PANEL

ELECTRIC PANEL 100

PANEL MCC 101

PANEL MCC 102

ELECTRIC PANEL MBR

ELECTRIC PANEL LIFTING

PLC ELECTRIC PANEL

Teatek srl

Via Maddaloni snc
c/o Consorzio 'AREA'
Acerra - 80011
NAPOLI - ITALY

info@teatek.it

+39 08118919610

P.IVA 06362981216

Leave a message

PRIVACY

5 + 9 =