MASCHERONE PURIFIER

TEATEK WATER

YEAR: 2021

PROJECT: UNDER CONSTRUCTION

CLIENT: ACEA ATO 2

LOCATION:  FIANO ROMANO (ROMA)

DESIGN AND CONSTRUCTION OF THE ELECTRICAL PANELS OF THE MASCHERONE PURIFIER, MANAGED THROUGH PLC.

PLANT DESIGN: calculation report, electrical report, lighting calculation for internal and external rooms, floor plans for cabin and switchboard rooms, cable ducts.
REALIZATION PCC PANEL
REALIZATION ELECTRIC PANEL 100 for distribution
REALIZATION PANEL MCC 101 with two 18.5KW inverter starts and 11 direct starts
REALIZATION PANEL MCC 102 with 9 direct starts
REALIZATION ELECTRIC PANEL MBR with 3, 55 KW, inverter starts. 3, 15 Kw, inverter starts and 8 direct starts
REALIZATION ELECTRIC PANEL LIFTING with 4, 15 Kw, inverter Starts
REALIZATION PLC ELECTRIC PANEL for the automation of the purifier

PCC PANEL

ELECTRIC PANEL 100

PANEL MCC 101

PANEL MCC 102

ELECTRIC PANEL MBR

ELECTRIC PANEL LIFTING

PLC ELECTRIC PANEL

Teatek S.P.A.

REGISTERED OFFICE
NAPOLI Via S. Lucia 36 - 80132

OPERATIONALS OFFICES
NAPOLI: Via Maddaloni snc c/o Consorzio 'AREA' - 80011 ACERRA
ROMA: Contrada Piombinara snc - 00034 COLLEFERRO
MILANO*: Via Polveriera 25 - 20026 NOVATE MILANESE

           *LOCATION NOT SUBJECT TO ISO VERIFICATION

info@teatek.it
teatek@adpec.it

+39 08118919610

P.IVA 06362981216

Leave a message

PRIVACY

1 + 4 =

TeaTek Logo Soatech
TeaTek Logo Perry Johnson
TeaTek Logo PJ
Developed by