Extraordinary maintenance of the white water lifting system, Municipality of Brusciano (NA)

Plant design: calculation report, electrical report.
Construction, supply, installation and connections of electrical panels:

  • QGBT Water pump start-up with Softstart;
  • Electric panel TT-Control management of Avv. QGBT;
  • Panel for the fixed power factor correction of users with constant absorption;
  • ABB 3Kva UPS;
  • Laying only MV / LV transformer
  • Supply and installation of MV cables from MV cell to Trafo;
  • Supply and installation of LV cables from Trafo to QGBT;
  • Supply and installation of LV cables from QGBT to Idrovore;
  • Supply and installation of LV QGBT to Grid cables;
  • Supply and installation of signal cables from PLC to Idrovore and Griglia, from PLC to QGBT;
  • Supply and installation of galvanized duct including special pieces;
  • Supply and installation of taz pipe and reinforced sheath;
  • Only laying of piezoresistive sensor and 4 floats

DETAILS

EXTERNAL

Teatek S.P.A.

REGISTERED OFFICE
NAPOLI Via S. Lucia 36 - 80132

OPERATIONALS OFFICES
NAPOLI: Via Maddaloni snc c/o Consorzio 'AREA' - 80011 ACERRA
ROMA: Contrada Piombinara snc - 00034 COLLEFERRO
MILANO*: Via Polveriera 25 - 20026 NOVATE MILANESE

           *LOCATION NOT SUBJECT TO ISO VERIFICATION

info@teatek.it
teatek@adpec.it

+39 08118919610

P.IVA 06362981216

Leave a message

PRIVACY

7 + 2 =

TeaTek Logo Soatech
TeaTek Logo Perry Johnson
TeaTek Logo PJ
Developed by