ACEA ATO 2 Sewerage System
TEATEK WATER
YEAR: 2020
PROJECT: ENDED
CUSTOMER: ACEA
PLANT: ARCINAZZO – TREVI NEL LAZIO – PIGLIO (ROMA)
Design, construction and installation of 14 electrical panels for the management of sewage lifting through TT-Control.
Electrical scheme design.
Realization of electrical panels with direct and soft start for sewage lifting pumps, lifting management through TT-Control.
Construction of electrical system and driving force of the site.
Lighting system inside and outside the switchboard room.
DETAILS
Teatek S.P.A.
REGISTERED OFFICE
NAPOLI Via S. Lucia 36 - 80132
OPERATIONALS OFFICES
NAPOLI: Via Maddaloni snc c/o Consorzio 'AREA' - 80011 ACERRA
ROMA: Contrada Piombinara snc - 00034 COLLEFERRO
MILANO*: Via Polveriera 25 - 20026 NOVATE MILANESE
*LOCATION NOT SUBJECT TO ISO VERIFICATION
teatek@adpec.it
+39 08118919610
P.IVA 06362981216